Triple

T7629019
Position Surface form Disambiguated ID Type / Status
Subject Plan Zuid E172711 entity
Predicate instanceOf P0 FINISHED
Object urban expansion plan C15908 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban expansion plan
Context triple: [Plan Zuid, instanceOf, urban expansion plan]
  • A. urban development
    Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
  • B. town plan chosen
    A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
  • C. land use plan
    A land use plan is a strategic document that guides the allocation, development, and conservation of land within a defined area to balance environmental, social, and economic objectives.
  • D. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • E. urban design project
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c699517e348190bd3348b6889200f2 completed March 27, 2026, 2:50 p.m.
Created at: March 27, 2026, 3:56 p.m.