Triple

T7627353
Position Surface form Disambiguated ID Type / Status
Subject Bekasi E172668 entity
Predicate hasTransport P1298 FINISHED
Object LRT Jabodebek E592880 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: LRT Jabodebek | Statement: [Bekasi, hasTransport, LRT Jabodebek]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: LRT Jabodebek
Context triple: [Bekasi, hasTransport, LRT Jabodebek]
  • A. Jakarta LRT chosen
    Jakarta LRT is a light rail transit system serving parts of the Greater Jakarta metropolitan area in Indonesia, designed to alleviate traffic congestion and improve urban mobility.
  • B. KRL Commuterline
    KRL Commuterline is the electric commuter rail network serving the Greater Jakarta metropolitan area, providing mass transit for millions of daily passengers.
  • C. Jakarta MRT
    Jakarta MRT is a rapid transit system serving Indonesia’s capital region, designed to reduce congestion and improve urban mobility through modern, high-capacity rail services.
  • D. Jakarta BRT (TransJakarta)
    Jakarta BRT (TransJakarta) is a bus rapid transit system in Indonesia’s capital that uses dedicated lanes and high-capacity buses to provide mass public transportation across the city.
  • E. Jakarta–Bogor railway
    The Jakarta–Bogor railway is a major commuter and intercity rail line in West Java, Indonesia, connecting the capital city Jakarta with the regional city of Bogor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c699517e348190bd3348b6889200f2 completed March 27, 2026, 2:50 p.m.
NER Named-entity recognition batch_69c6fa8150ac8190908aec411b0f4e50 completed March 27, 2026, 9:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69c89ab1132481909e525e90764df041 completed March 29, 2026, 3:21 a.m.
Created at: March 27, 2026, 3:56 p.m.