Triple

T7623118
Position Surface form Disambiguated ID Type / Status
Subject House of the Sun E172549 entity
Predicate isDormantOrActive P17096 FINISHED
Object dormant volcano LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: dormant volcano | Statement: [House of the Sun, isDormantOrActive, dormant volcano]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isDormantOrActive
Context triple: [House of the Sun, isDormantOrActive, dormant volcano]
  • A. isDormant chosen
    Indicates that an entity is currently inactive or in a resting state, with its usual functions or activities temporarily suspended.
  • B. isActive
    Indicates that an entity is currently functioning, engaged, or enabled within a given context or system.
  • C. isPotentiallyActive
    Indicates that an entity has the capacity or conditions to become active, but is not necessarily active at the present moment.
  • D. agencyStatus
    Indicates the current operational or legal condition under which an agency or agent is functioning (e.g., active, inactive, suspended, or terminated).
  • E. hasActivityStatus
    Indicates the current state or condition of an activity, such as whether it is planned, ongoing, completed, or cancelled.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c699506b308190826894dab1d9ea86 completed March 27, 2026, 2:50 p.m.
NER Named-entity recognition batch_69c6fe73ff7c8190ab1218d97b37416d completed March 27, 2026, 10:02 p.m.
PD Predicate disambiguation batch_69c6f4e725a88190b1f05dd224f7f4f2 completed March 27, 2026, 9:21 p.m.
Created at: March 27, 2026, 3:56 p.m.