Triple

T7612642
Position Surface form Disambiguated ID Type / Status
Subject Arizona State Route 51 E172279 entity
Predicate abbreviation P43 FINISHED
Object SR 51
SR 51 is a major north–south freeway in the Phoenix, Arizona metropolitan area that connects downtown Phoenix with its northeastern suburbs.
E678526 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 51 | Statement: [Arizona State Route 51, abbreviation, SR 51]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 51
Context triple: [Arizona State Route 51, abbreviation, SR 51]
  • A. SR 55
    SR 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • B. SR 57
    SR 57 is a state highway in Ohio that serves as a regional connector route through several communities in the northern part of the state.
  • C. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • D. SR 509
    SR 509 is a state highway in Washington that serves as a key north–south route connecting cities in the Puget Sound region, including Tacoma and Seattle’s southern suburbs.
  • E. SR 56
    SR 56 is a state highway in Indiana that runs east–west across the southern part of the state, connecting several towns and regional routes.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 51
Triple: [Arizona State Route 51, abbreviation, SR 51]
Generated description
SR 51 is a major north–south freeway in the Phoenix, Arizona metropolitan area that connects downtown Phoenix with its northeastern suburbs.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 51
Target entity description: SR 51 is a major north–south freeway in the Phoenix, Arizona metropolitan area that connects downtown Phoenix with its northeastern suburbs.
  • A. SR 55
    SR 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • B. SR 57
    SR 57 is a state highway in Ohio that serves as a regional connector route through several communities in the northern part of the state.
  • C. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • D. SR 509
    SR 509 is a state highway in Washington that serves as a key north–south route connecting cities in the Puget Sound region, including Tacoma and Seattle’s southern suburbs.
  • E. SR 56
    SR 56 is a state highway in Indiana that runs east–west across the southern part of the state, connecting several towns and regional routes.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6994f50808190ba228764bb422417 completed March 27, 2026, 2:50 p.m.
NER Named-entity recognition batch_69c6fa23981c81908168ac0ac9add5d8 completed March 27, 2026, 9:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69c87097d3a48190b337ff6906847d4e completed March 29, 2026, 12:21 a.m.
NEDg Description generation batch_69c875abea90819080071e65bd63ee13 completed March 29, 2026, 12:43 a.m.
NED2 Entity disambiguation (via description) batch_69c876103db081909ce762544ef70460 completed March 29, 2026, 12:45 a.m.
Created at: March 27, 2026, 3:55 p.m.