Triple

T7606429
Position Surface form Disambiguated ID Type / Status
Subject Kasumigaseki E180115 entity
Predicate hasRoadAccess P385 FINISHED
Object National Route 1 E141720 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Route 1 | Statement: [Kasumigaseki, hasRoadAccess, National Route 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: National Route 1
Context triple: [Kasumigaseki, hasRoadAccess, National Route 1]
  • A. National Route 1 chosen
    National Route 1 is a major Japanese highway that links Tokyo with Osaka, passing through key urban and industrial areas along the Pacific coast of Honshu.
  • B. National Route 10
    National Route 10 is a major Vietnamese highway that runs through the Red River Delta, linking key northern coastal provinces and cities, including Nam Dinh.
  • C. National Route 1A
    National Route 1A is Vietnam’s primary north–south highway, running the length of the country and connecting major cities, provinces, and economic regions.
  • D. National Route 2
    National Route 2 is a major Japanese highway that runs along the southern coast of Honshu, linking Osaka with Fukuoka and serving numerous cities in western Japan.
  • E. National Route 17
    National Route 17 is a major South Korean highway that runs north–south across the country, connecting multiple cities and regions including Eumseong County.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f3567008190ab01d2ca7b53584a completed March 27, 2026, 3:16 p.m.
NER Named-entity recognition batch_69c6f9fe10408190b1c12bb8f911cea8 completed March 27, 2026, 9:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8b4f142c48190a63f6e25dad3d57e completed March 29, 2026, 5:13 a.m.
Created at: March 27, 2026, 3:54 p.m.