Triple

T7603534
Position Surface form Disambiguated ID Type / Status
Subject Igunga District E180042 entity
Predicate roadConnection P385 FINISHED
Object Tanzam Highway vicinity E472366 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tanzam Highway vicinity | Statement: [Igunga District, roadConnection, Tanzam Highway vicinity]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tanzam Highway vicinity
Context triple: [Igunga District, roadConnection, Tanzam Highway vicinity]
  • A. Tanzam Highway chosen
    The Tanzam Highway is a key transport corridor in Tanzania that links the coastal city of Dar es Salaam with the landlocked nation of Zambia, facilitating regional trade and travel.
  • B. Arusha–Dodoma road
    The Arusha–Dodoma road is a major Tanzanian highway linking the northern city of Arusha with the national capital, Dodoma, and serving as an important route for regional travel and trade.
  • C. Mutare–Beira corridor to Mozambique
    The Mutare–Beira corridor to Mozambique is a key regional transport route linking eastern Zimbabwe to the Mozambican port city of Beira, facilitating trade and transit between inland Southern Africa and the Indian Ocean.
  • D. Nacala Corridor
    The Nacala Corridor is a major transport and logistics route in Mozambique and neighboring countries, linking inland mining and agricultural regions to the Indian Ocean via the Port of Nacala.
  • E. Arusha–Namanga road
    The Arusha–Namanga road is a major highway linking northern Tanzania with Kenya, serving as a key route for cross-border trade and travel between the two countries.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f3567008190ab01d2ca7b53584a completed March 27, 2026, 3:16 p.m.
NER Named-entity recognition batch_69c6f9fa633081909660f653f5b073cd completed March 27, 2026, 9:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8684f3cf08190bc3cbafbd8c1b9a0 completed March 28, 2026, 11:46 p.m.
Created at: March 27, 2026, 3:54 p.m.