Triple

T7587774
Position Surface form Disambiguated ID Type / Status
Subject East Coast Line E179658 entity
Predicate SwedishName P11737 FINISHED
Object Ostkustbanan E147916 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ostkustbanan | Statement: [East Coast Line, SwedishName, Ostkustbanan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ostkustbanan
Context triple: [East Coast Line, SwedishName, Ostkustbanan]
  • A. Ostkustbanan railway line chosen
    The Ostkustbanan railway line is a major Swedish rail route running along the country’s east coast, connecting Stockholm with northern regions and serving numerous municipalities along the way.
  • B. Saltsjöbanan
    Saltsjöbanan is a suburban railway line in the Stockholm area that connects central Stockholm with the eastern suburbs, including parts of Nacka Municipality.
  • C. Roslagsbanan
    Roslagsbanan is a narrow-gauge suburban railway line in the Stockholm region of Sweden that provides commuter rail services to several northern suburbs.
  • D. Västra stambanan
    Västra stambanan is one of Sweden’s main railway lines, connecting Stockholm with Gothenburg and serving as a key corridor for both passenger and freight traffic.
  • E. Bergslagen Line
    The Bergslagen Line is a Swedish railway route running through the historic Bergslagen mining and industrial region, connecting several towns in central Sweden.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f335248819093c1006f30513708 completed March 27, 2026, 3:16 p.m.
NER Named-entity recognition batch_69c6f99875908190b09584cf13ea1e08 completed March 27, 2026, 9:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69c89a957e2881909c7592f673bea26f completed March 29, 2026, 3:20 a.m.
Created at: March 27, 2026, 3:52 p.m.