Triple
T7584145
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Narvik railway station |
E179563
|
entity |
| Predicate | near |
P350
|
FINISHED |
| Object | E6 highway |
E347764
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: E6 highway | Statement: [Narvik railway station, near, E6 highway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: E6 highway Context triple: [Narvik railway station, near, E6 highway]
-
A.
E6 highway
chosen
The E6 highway is a major north–south European route running through Norway and Sweden, serving as a key arterial road for long-distance travel and freight transport.
-
B.
A8 highway
The A8 highway is a major road in Latvia that connects the capital Riga with the city of Jelgava and continues toward the Lithuanian border.
-
C.
A7 highway
The A7 highway is a major Tanzanian road that connects key regions in the country and passes directly through Mikumi National Park, offering access to both local communities and wildlife tourism areas.
-
D.
E42 motorway
The E42 motorway is a major European route running across Belgium, connecting key cities and regions as part of the trans-European road network.
-
E.
A4 highway
The A4 highway is a major road route that connects with the A2 coastal highway, serving as an important link in the regional transportation network.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f327db881909a21ae3b156f8ded |
completed | March 27, 2026, 3:16 p.m. |
| NER | Named-entity recognition | batch_69c6f993cd0c8190864f801074625a32 |
completed | March 27, 2026, 9:41 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69e215ac56248190a75ad5ceb8152d5a |
completed | April 17, 2026, 11:12 a.m. |
Created at: March 27, 2026, 3:52 p.m.