Triple

T7583658
Position Surface form Disambiguated ID Type / Status
Subject Division 2 (Emeryville) E179552 entity
Predicate instanceOf P0 FINISHED
Object bus operations and maintenance facility C4156 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bus operations and maintenance facility
Context triple: [Division 2 (Emeryville), instanceOf, bus operations and maintenance facility]
  • A. light rail operations facility
    A light rail operations facility is a specialized complex where light rail vehicles are stored, maintained, dispatched, and managed to support safe and efficient transit service.
  • B. maintenance facility chosen
    A maintenance facility is a dedicated location equipped with tools, resources, and personnel for inspecting, repairing, and servicing equipment, vehicles, or infrastructure to ensure their proper functioning and longevity.
  • C. ground transportation facility
    A ground transportation facility is a designated location that supports the movement, transfer, and management of passengers or goods via land-based modes such as buses, trains, cars, or trucks.
  • D. rapid transit depot
    A rapid transit depot is a specialized facility where urban rail vehicles are stored, inspected, maintained, and dispatched for service on a rapid transit network.
  • E. public transit operations division
    The public transit operations division is responsible for planning, scheduling, managing, and overseeing the daily operation and performance of a region’s public transportation services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f327db881909a21ae3b156f8ded completed March 27, 2026, 3:16 p.m.
Created at: March 27, 2026, 3:52 p.m.