Triple

T7570422
Position Surface form Disambiguated ID Type / Status
Subject Witham, Essex, England E179224 entity
Predicate liesOn P3250 FINISHED
Object River Brain E442144 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: River Brain | Statement: [Witham, Essex, England, liesOn, River Brain]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: River Brain
Context triple: [Witham, Essex, England, liesOn, River Brain]
  • A. River Brain chosen
    The River Brain is a small river in Essex, England, that serves as a tributary of the River Blackwater and flows through the town of Witham.
  • B. River Till
    River Till is a river in the Scottish Borders and northern England that flows through Northumberland before joining the River Tweed.
  • C. River Till
    River Till is a small river in Lincolnshire, England, that flows through rural farmland before joining the River Witham near Lincoln.
  • D. River Nar
    The River Nar is a small river in Norfolk, England, that flows through the countryside to join the River Great Ouse near King’s Lynn.
  • E. Drift River
    Drift River is a river in Alaska that flows into Cook Inlet, known for its proximity to the Redoubt Volcano and associated lahar and flooding hazards.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f316e50819081a271c85c06f918 completed March 27, 2026, 3:16 p.m.
NER Named-entity recognition batch_69c6f920540c8190817712db5aa3eeff completed March 27, 2026, 9:39 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8707beee881909199518c8ceb3076 completed March 29, 2026, 12:21 a.m.
Created at: March 27, 2026, 3:51 p.m.