Triple
T7565539
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fonthill Castle |
E178903
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | concrete building |
C240
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: concrete building Context triple: [Fonthill Castle, instanceOf, concrete building]
-
A.
reinforced concrete structure
A reinforced concrete structure is a construction system in which concrete is combined with embedded steel reinforcement to resist both compressive and tensile forces, providing strength, durability, and stability for buildings and infrastructure.
-
B.
construction material
A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
-
C.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
-
D.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
-
E.
building
chosen
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f2f80288190b95cceb4da92ab2b |
completed | March 27, 2026, 3:15 p.m. |
Created at: March 27, 2026, 3:50 p.m.