Triple

T755687
Position Surface form Disambiguated ID Type / Status
Subject Clean Air Action Plan E15549 entity
Predicate instanceOf P0 FINISHED
Object port emissions reduction initiative C5436 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: port emissions reduction initiative
Context triple: [Clean Air Action Plan, instanceOf, port emissions reduction initiative]
  • A. seaport
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • B. port authority
    A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
  • C. harbor
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • D. water pollution control program
    A water pollution control program is an organized set of policies, regulations, monitoring activities, and treatment measures designed to prevent, reduce, and manage contaminants entering water bodies to protect human health and aquatic ecosystems.
  • E. maritime navigation authority
    A maritime navigation authority is an organization responsible for regulating, managing, and ensuring the safety and efficiency of vessel movements and navigational systems within designated waters.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493599a0081908da65f3407af1ef2 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:37 p.m.