Triple
T7555264
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CMAP |
E178645
|
entity |
| Predicate | overseesPlan |
P77954
|
FINISHED |
| Object |
GO TO 2040 comprehensive regional plan
GO TO 2040 comprehensive regional plan is a long-range blueprint for coordinated land use, transportation, housing, and economic development in the Chicago metropolitan region.
|
E673054
|
NE FINISHED |
How this triple was built (5 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GO TO 2040 comprehensive regional plan | Statement: [CMAP, overseesPlan, GO TO 2040 comprehensive regional plan]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: GO TO 2040 comprehensive regional plan Context triple: [CMAP, overseesPlan, GO TO 2040 comprehensive regional plan]
-
A.
Portland comprehensive plan
The Portland comprehensive plan is a long-range policy and land-use framework that guides the city’s growth, development patterns, and transportation systems, including the design and evolution of its street network.
-
B.
Delta Plan
The Delta Plan is a comprehensive Dutch flood protection and water management project designed to safeguard the low-lying Netherlands from the sea through an extensive system of dams, storm surge barriers, and dikes.
-
C.
Delta Plan
The Delta Plan is a comprehensive, long-term management and conservation strategy designed to protect, restore, and sustainably manage California’s Sacramento–San Joaquin River Delta ecosystem and water supply.
-
D.
Plan for the National Capital Region of Canada
The Plan for the National Capital Region of Canada is a mid-20th-century urban planning blueprint that reshaped Ottawa–Gatineau into a symbolically and functionally modern federal capital, emphasizing parkways, green spaces, and coordinated regional development.
-
E.
Basin Plan 2012
Basin Plan 2012 is an Australian water management plan that sets sustainable diversion limits and coordinated rules for sharing and protecting water resources across the Murray–Darling Basin.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: GO TO 2040 comprehensive regional plan Triple: [CMAP, overseesPlan, GO TO 2040 comprehensive regional plan]
Generated description
GO TO 2040 comprehensive regional plan is a long-range blueprint for coordinated land use, transportation, housing, and economic development in the Chicago metropolitan region.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: GO TO 2040 comprehensive regional plan Target entity description: GO TO 2040 comprehensive regional plan is a long-range blueprint for coordinated land use, transportation, housing, and economic development in the Chicago metropolitan region.
-
A.
Portland comprehensive plan
The Portland comprehensive plan is a long-range policy and land-use framework that guides the city’s growth, development patterns, and transportation systems, including the design and evolution of its street network.
-
B.
Delta Plan
The Delta Plan is a comprehensive Dutch flood protection and water management project designed to safeguard the low-lying Netherlands from the sea through an extensive system of dams, storm surge barriers, and dikes.
-
C.
Delta Plan
The Delta Plan is a comprehensive, long-term management and conservation strategy designed to protect, restore, and sustainably manage California’s Sacramento–San Joaquin River Delta ecosystem and water supply.
-
D.
Plan for the National Capital Region of Canada
The Plan for the National Capital Region of Canada is a mid-20th-century urban planning blueprint that reshaped Ottawa–Gatineau into a symbolically and functionally modern federal capital, emphasizing parkways, green spaces, and coordinated regional development.
-
E.
Basin Plan 2012
Basin Plan 2012 is an Australian water management plan that sets sustainable diversion limits and coordinated rules for sharing and protecting water resources across the Murray–Darling Basin.
- F. None of above. chosen
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: overseesPlan Context triple: [CMAP, overseesPlan, GO TO 2040 comprehensive regional plan]
-
A.
oversee
Indicates having responsibility for supervising, directing, or managing the actions or work of another entity.
-
B.
overseesProject
Indicates that one entity has responsibility for supervising, managing, or directing the progress and execution of a project involving another entity.
-
C.
overseesMission
Indicates that one entity has responsibility for supervising, directing, or managing the execution of a mission undertaken by another entity.
-
D.
plannedWith
Indicates that an entity created or arranged a plan in collaboration or coordination with another entity.
-
E.
plannedUnder
Indicates that one entity has been scheduled, organized, or arranged to occur within the scope, authority, or framework of another entity.
- F. None of above. chosen
Provenance (7 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f2da22c8190a50942ac20af70e8 |
completed | March 27, 2026, 3:15 p.m. |
| NER | Named-entity recognition | batch_69c6f8d82dd481908351876edc70c4ec |
completed | March 27, 2026, 9:38 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c856c20258819081761699228b8ba3 |
completed | March 28, 2026, 10:31 p.m. |
| NEDg | Description generation | batch_69c858501a6c81909a2186c264509be5 |
completed | March 28, 2026, 10:38 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69c858c151b881908d112c426ba34827 |
completed | March 28, 2026, 10:40 p.m. |
| PD | Predicate disambiguation | batch_69c6f4daad6c8190af2b8ae88d2c8cb7 |
completed | March 27, 2026, 9:21 p.m. |
| PDg | Predicate description generation | batch_69c6f8184bb08190b2f70545a6aa277c |
completed | March 27, 2026, 9:35 p.m. |
Created at: March 27, 2026, 3:49 p.m.