Triple

T7554914
Position Surface form Disambiguated ID Type / Status
Subject King of Prussia Rail extension E178637 entity
Predicate instanceOf P0 FINISHED
Object SEPTA capital project C22877 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: SEPTA capital project
Context triple: [King of Prussia Rail extension, instanceOf, SEPTA capital project]
  • A. MBTA Red Line extension project
    The MBTA Red Line extension project is a planned expansion of Boston’s Red Line rapid transit service, extending rail infrastructure and stations to improve regional connectivity, capacity, and access to public transportation.
  • B. AeroTrain station
    An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
  • C. Long Island Rail Road project
    A Long Island Rail Road project is a coordinated initiative to plan, construct, upgrade, or maintain LIRR infrastructure, services, or operations to improve rail transportation for its riders and communities.
  • D. section of Philadelphia
    A section of Philadelphia is a distinct geographic area within the city, typically characterized by shared residential, commercial, cultural, or historical features that give it a recognizable local identity.
  • E. Baltimore Metro SubwayLink station
    A Baltimore Metro SubwayLink station is a designated transit facility where passengers can board, alight, and transfer between Metro SubwayLink trains and other transportation modes within the Baltimore metropolitan area.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f2da22c8190a50942ac20af70e8 completed March 27, 2026, 3:15 p.m.
Created at: March 27, 2026, 3:49 p.m.