Triple
T7554045
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | E65 |
E178611
|
entity |
| Predicate | connectsToFerry |
P1737
|
FINISHED |
| Object |
Ystad–Świnoujście ferry route
The Ystad–Świnoujście ferry route is a major Baltic Sea passenger and freight link between southern Sweden and northwestern Poland, serving as an important corridor between Scandinavia and Central Europe.
|
E672370
|
NE FINISHED |
How this triple was built (5 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ystad–Świnoujście ferry route | Statement: [E65, connectsToFerry, Ystad–Świnoujście ferry route]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Ystad–Świnoujście ferry route Context triple: [E65, connectsToFerry, Ystad–Świnoujście ferry route]
-
A.
Nynäshamn–Gdańsk route
The Nynäshamn–Gdańsk route is an international Baltic Sea ferry connection linking Sweden and Poland, commonly used for both passenger and freight transport.
-
B.
Rindöleden ferry route
Rindöleden ferry route is a car and passenger ferry service in the Stockholm archipelago that connects the island of Rindö with the mainland road network.
-
C.
Sandefjord–Strömstad ferry
The Sandefjord–Strömstad ferry is a cross-border passenger and car ferry service linking southern Norway and western Sweden across the Skagerrak.
-
D.
Nynäshamn–Gotland route
The Nynäshamn–Gotland route is a Baltic Sea ferry connection linking mainland Sweden with the island of Gotland, primarily serving passenger and vehicle traffic.
-
E.
Toft–Ulsta ferry
The Toft–Ulsta ferry is a key vehicle and passenger ferry service linking the Shetland Mainland with the island of Yell across Yell Sound in Scotland.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Ystad–Świnoujście ferry route Triple: [E65, connectsToFerry, Ystad–Świnoujście ferry route]
Generated description
The Ystad–Świnoujście ferry route is a major Baltic Sea passenger and freight link between southern Sweden and northwestern Poland, serving as an important corridor between Scandinavia and Central Europe.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Ystad–Świnoujście ferry route Target entity description: The Ystad–Świnoujście ferry route is a major Baltic Sea passenger and freight link between southern Sweden and northwestern Poland, serving as an important corridor between Scandinavia and Central Europe.
-
A.
Nynäshamn–Gdańsk route
The Nynäshamn–Gdańsk route is an international Baltic Sea ferry connection linking Sweden and Poland, commonly used for both passenger and freight transport.
-
B.
Rindöleden ferry route
Rindöleden ferry route is a car and passenger ferry service in the Stockholm archipelago that connects the island of Rindö with the mainland road network.
-
C.
Sandefjord–Strömstad ferry
The Sandefjord–Strömstad ferry is a cross-border passenger and car ferry service linking southern Norway and western Sweden across the Skagerrak.
-
D.
Nynäshamn–Gotland route
The Nynäshamn–Gotland route is a Baltic Sea ferry connection linking mainland Sweden with the island of Gotland, primarily serving passenger and vehicle traffic.
-
E.
Toft–Ulsta ferry
The Toft–Ulsta ferry is a key vehicle and passenger ferry service linking the Shetland Mainland with the island of Yell across Yell Sound in Scotland.
- F. None of above. chosen
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: connectsToFerry Context triple: [E65, connectsToFerry, Ystad–Świnoujście ferry route]
-
A.
hasFerryService
chosen
Indicates that there is an operational ferry connection or transport service available between the related locations or entities.
-
B.
hasFerryComponent
Indicates that something includes or is associated with a ferry-related part, feature, or segment within its structure or operation.
-
C.
hasFerryType
Indicates that an entity (such as a ferry route or service) is associated with a specific type or category of ferry.
-
D.
hasFerryPort
Indicates that a place serves as a location where ferries regularly dock to load and unload passengers or cargo.
-
E.
hasNearbyFerryPort
Indicates that one location is situated close enough to another location that serves as a ferry port to be considered nearby.
- F. None of above.
Provenance (6 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f2da22c8190a50942ac20af70e8 |
completed | March 27, 2026, 3:15 p.m. |
| NER | Named-entity recognition | batch_69c6f8b990148190b26a3a262cf538b3 |
completed | March 27, 2026, 9:38 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c84f3602008190aa91cf55e43bdf30 |
completed | March 28, 2026, 9:59 p.m. |
| NEDg | Description generation | batch_69c85432ff8c81909f5ec837fd1f6743 |
completed | March 28, 2026, 10:20 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69c854bbb9c08190bc151cdcef74ee54 |
completed | March 28, 2026, 10:22 p.m. |
| PD | Predicate disambiguation | batch_69c6f4daad6c8190af2b8ae88d2c8cb7 |
completed | March 27, 2026, 9:21 p.m. |
Created at: March 27, 2026, 3:49 p.m.