Triple
T7541388
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Runway 5 |
E178282
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | airport infrastructure designation |
C2678
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: airport infrastructure designation Context triple: [Runway 5, instanceOf, airport infrastructure designation]
-
A.
airport system
An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
-
B.
Airport
An airport is a complex transportation hub where aircraft take off, land, are serviced, and passengers and cargo transition between air and ground travel through various terminals and support facilities.
-
C.
public airport
A public airport is a government- or publicly-owned aviation facility open for use by the general public, providing infrastructure and services for commercial, private, and cargo air transportation.
-
D.
airport runway
chosen
An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
-
E.
airport service area
An airport service area is the designated zone within and around an airport where operational, maintenance, and support activities are conducted to facilitate aircraft handling and passenger services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f2be3888190a6667a27f8f195e9 |
completed | March 27, 2026, 3:15 p.m. |
Created at: March 27, 2026, 3:48 p.m.