Triple
T7534520
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | River Lee |
E178112
|
entity |
| Predicate | managedBy |
P86
|
FINISHED |
| Object | Electricity Supply Board (ESB) for dams and hydropower |
E594489
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Electricity Supply Board (ESB) for dams and hydropower | Statement: [River Lee, managedBy, Electricity Supply Board (ESB) for dams and hydropower]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Electricity Supply Board (ESB) for dams and hydropower Context triple: [River Lee, managedBy, Electricity Supply Board (ESB) for dams and hydropower]
-
A.
Electricity Supply Board
chosen
Electricity Supply Board is Ireland’s state-owned electricity company responsible for generation, transmission, and supply of electric power across the country.
-
B.
Scottish Hydro-Electric
Scottish Hydro-Electric was a major Scottish electricity generation and distribution company that became one of the core predecessors of today’s SSE plc.
-
C.
Central Electricity Generating Board
The Central Electricity Generating Board was the state-owned body responsible for electricity generation and bulk transmission in England and Wales from the late 1950s until privatization in the early 1990s.
-
D.
British Electricity Authority
The British Electricity Authority was the nationalized body responsible for generating and supplying electricity in Great Britain in the early post-World War II period.
-
E.
Blenheim-Gilboa Pumped Storage Power Project
Blenheim-Gilboa Pumped Storage Power Project is a large hydroelectric pumped-storage facility in New York State that stores and generates electricity by moving water between two reservoirs to help balance the power grid.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f2acdbc8190b5a8320168c1d0ba |
completed | March 27, 2026, 3:15 p.m. |
| NER | Named-entity recognition | batch_69c6f84a9d28819084ebfc44fcb2c29c |
completed | March 27, 2026, 9:36 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c84f0765b48190b8df68f22c8901f4 |
completed | March 28, 2026, 9:58 p.m. |
Created at: March 27, 2026, 3:47 p.m.