Triple
T7526626
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Northgate Shopping Center |
E177909
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | suburban shopping center |
C1524
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: suburban shopping center Context triple: [Northgate Shopping Center, instanceOf, suburban shopping center]
-
A.
shopping centre
chosen
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
B.
suburban centre
A suburban centre is a focal area within a suburb that concentrates retail, services, and community facilities, serving as a local hub for surrounding residential neighborhoods.
-
C.
shopping mall
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
-
D.
shopping area
A shopping area is a designated space, such as a street, district, or complex, where multiple retail stores and related services are concentrated for consumer purchasing and leisure activities.
-
E.
urban plaza
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f29bf3081909a146aec7755f185 |
completed | March 27, 2026, 3:15 p.m. |
Created at: March 27, 2026, 3:47 p.m.