Triple

T7523862
Position Surface form Disambiguated ID Type / Status
Subject STS-90 E177842 entity
Predicate instanceOf P0 FINISHED
Object Neurolab mission C5891 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Neurolab mission
Context triple: [STS-90, instanceOf, Neurolab mission]
  • A. Mars mission engineering activity
    Mars mission engineering activity encompasses the planning, design, testing, and integration of systems and technologies required to safely transport, land, and support missions on the Martian surface and in its orbit.
  • B. Space Shuttle mission chosen
    A Space Shuttle mission is a coordinated spaceflight operation using the Space Shuttle orbiter to transport crew, cargo, and conduct scientific or technical objectives in Earth orbit and beyond.
  • C. NASA mission component
    A NASA mission component is a distinct hardware, software, or operational element designed to perform a specific function that contributes to the overall objectives and success of a NASA space mission.
  • D. NASA field center precursor
    A NASA field center precursor is an early organizational entity, facility, or program that laid the technical, institutional, or infrastructural groundwork for the later establishment of a formal NASA field center.
  • E. NASA space mission
    A NASA space mission is a coordinated, goal-driven endeavor planned and executed by NASA to explore, observe, or utilize space using specialized spacecraft, instruments, and supporting ground operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f29bf3081909a146aec7755f185 completed March 27, 2026, 3:15 p.m.
Created at: March 27, 2026, 3:46 p.m.