Triple

T7509605
Position Surface form Disambiguated ID Type / Status
Subject Thacher Island Twin Lights E177483 entity
Predicate instanceOf P0 FINISHED
Object lighthouse station C19124 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: lighthouse station
Context triple: [Thacher Island Twin Lights, instanceOf, lighthouse station]
  • A. coastal lighthouse chosen
    A coastal lighthouse is a tall, often cylindrical structure built along shorelines to emit a guiding light and navigational signals that warn ships of hazards and help them safely navigate coastal waters.
  • B. ornamental lighthouse
    An ornamental lighthouse is a decorative structure or object, often miniature or stylized, designed to aesthetically evoke the form and symbolism of a real lighthouse without serving a functional navigational purpose.
  • C. former lighthouse
    A former lighthouse is a decommissioned navigational tower, once used to guide maritime traffic with its beacon, that has since been repurposed or left as a historical coastal landmark.
  • D. cast-iron lighthouse
    A cast-iron lighthouse is a navigational tower constructed primarily from prefabricated cast-iron plates or segments, designed to withstand harsh marine environments while housing a light to guide vessels safely.
  • E. screw-pile lighthouse
    A screw-pile lighthouse is a type of lighthouse built on piles with helical screw bases that are screwed into the seabed, providing a stable foundation in soft or sandy bottoms, typically in shallow coastal waters.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f276b108190af2cc790b6554544 completed March 27, 2026, 3:15 p.m.
Created at: March 27, 2026, 3:45 p.m.