Triple

T7508538
Position Surface form Disambiguated ID Type / Status
Subject Woodlands E177455 entity
Predicate instanceOf P0 FINISHED
Object Residential town C7309 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Residential town
Context triple: [Woodlands, instanceOf, Residential town]
  • A. Residential district
    A residential district is an area of a city or town primarily designated for housing, where people live in various types of dwellings and are supported by local amenities and services.
  • B. planned residential community
    A planned residential community is a deliberately designed neighborhood or development where housing, infrastructure, amenities, and land use are pre-organized to create a cohesive living environment.
  • C. commuter town
    A commuter town is a residential community where most residents travel to work in a nearby city or employment center rather than working locally.
  • D. rural town
    A rural town is a small, sparsely populated community situated in the countryside, typically characterized by close-knit social ties, limited infrastructure, and an economy often based on agriculture or local resource industries.
  • E. Town chosen
    A town is a moderately sized human settlement that serves as a local center for residence, commerce, and community services, typically larger than a village but smaller than a city.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f276b108190af2cc790b6554544 completed March 27, 2026, 3:15 p.m.
Created at: March 27, 2026, 3:45 p.m.