Triple
T7508537
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Woodlands |
E177455
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Planning area in Singapore |
C13404
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Planning area in Singapore Context triple: [Woodlands, instanceOf, Planning area in Singapore]
-
A.
city in Malaysia
A city in Malaysia is an urban administrative area recognized by the federal or state government, typically characterized by dense population, developed infrastructure, and serving as a regional center for governance, commerce, culture, and services.
-
B.
town plan
A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
-
C.
land use planning area
A land use planning area is a defined geographic region designated for coordinated management and regulation of land uses to achieve specific environmental, social, and economic development objectives.
-
D.
community plan area
A community plan area is a geographically defined section of a jurisdiction for which detailed land use, development, and infrastructure policies are established to guide local growth and community character.
-
E.
planning district
chosen
A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f276b108190af2cc790b6554544 |
completed | March 27, 2026, 3:15 p.m. |
Created at: March 27, 2026, 3:45 p.m.