Triple

T7508537
Position Surface form Disambiguated ID Type / Status
Subject Woodlands E177455 entity
Predicate instanceOf P0 FINISHED
Object Planning area in Singapore C13404 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Planning area in Singapore
Context triple: [Woodlands, instanceOf, Planning area in Singapore]
  • A. city in Malaysia
    A city in Malaysia is an urban administrative area recognized by the federal or state government, typically characterized by dense population, developed infrastructure, and serving as a regional center for governance, commerce, culture, and services.
  • B. town plan
    A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
  • C. land use planning area
    A land use planning area is a defined geographic region designated for coordinated management and regulation of land uses to achieve specific environmental, social, and economic development objectives.
  • D. community plan area
    A community plan area is a geographically defined section of a jurisdiction for which detailed land use, development, and infrastructure policies are established to guide local growth and community character.
  • E. planning district chosen
    A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f276b108190af2cc790b6554544 completed March 27, 2026, 3:15 p.m.
Created at: March 27, 2026, 3:45 p.m.