Triple
T7492017
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | crawler-transporter |
E177027
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | NASA ground support equipment |
C22460
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: NASA ground support equipment Context triple: [crawler-transporter, instanceOf, NASA ground support equipment]
-
A.
ground segment equipment
Ground segment equipment comprises the terrestrial hardware and software systems that support, control, communicate with, and process data from space-based assets such as satellites.
-
B.
NASA rocket engine test facility
A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
-
C.
NASA center
A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
-
D.
NASA field center precursor
A NASA field center precursor is an early organizational entity, facility, or program that laid the technical, institutional, or infrastructural groundwork for the later establishment of a formal NASA field center.
-
E.
Mars rover instrument
A Mars rover instrument is a specialized scientific device mounted on a Mars rover that measures, analyzes, or images the Martian environment and geology to support planetary research and exploration objectives.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f2583808190bd1a4936c42a5815 |
completed | March 27, 2026, 3:15 p.m. |
Created at: March 27, 2026, 3:43 p.m.