Triple

T7492017
Position Surface form Disambiguated ID Type / Status
Subject crawler-transporter E177027 entity
Predicate instanceOf P0 FINISHED
Object NASA ground support equipment C22460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: NASA ground support equipment
Context triple: [crawler-transporter, instanceOf, NASA ground support equipment]
  • A. ground segment equipment
    Ground segment equipment comprises the terrestrial hardware and software systems that support, control, communicate with, and process data from space-based assets such as satellites.
  • B. NASA rocket engine test facility
    A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
  • C. NASA center
    A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
  • D. NASA field center precursor
    A NASA field center precursor is an early organizational entity, facility, or program that laid the technical, institutional, or infrastructural groundwork for the later establishment of a formal NASA field center.
  • E. Mars rover instrument
    A Mars rover instrument is a specialized scientific device mounted on a Mars rover that measures, analyzes, or images the Martian environment and geology to support planetary research and exploration objectives.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f2583808190bd1a4936c42a5815 completed March 27, 2026, 3:15 p.m.
Created at: March 27, 2026, 3:43 p.m.