Triple

T7483145
Position Surface form Disambiguated ID Type / Status
Subject Tornionjoki E176811 entity
Predicate flowsThrough P225 FINISHED
Object Tornio E175026 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tornio | Statement: [Tornionjoki, flowsThrough, Tornio]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tornio
Context triple: [Tornionjoki, flowsThrough, Tornio]
  • A. Tornio chosen
    Tornio is a Finnish town located at the northern end of the Gulf of Bothnia, known for its cross-border connection with Sweden and its long history as a trading and industrial center.
  • B. Tornionjoki
    Tornionjoki is a river forming part of the border between Sweden and Finland, known for its salmon fishing and its course into the northern Gulf of Bothnia.
  • C. Nokianvirta River
    The Nokianvirta River is a waterway in southwestern Finland that flows through the town of Nokia and has historically influenced the region’s settlement and industry.
  • D. Narva River
    The Narva River is a major river in northeastern Europe that forms part of the border between Estonia and Russia, flowing from Lake Peipus into the Baltic Sea.
  • E. Kemijoki
    Kemijoki is the longest river in Finland, flowing through Lapland to the Gulf of Bothnia and serving as a major source of hydroelectric power.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f24ac508190bb98fe927c0bd065 completed March 27, 2026, 3:15 p.m.
NER Named-entity recognition batch_69c6f53923e4819081bf79ed962a971c completed March 27, 2026, 9:23 p.m.
NED1 Entity disambiguation (via context triple) batch_69c83498965481909367681b63c5db63 completed March 28, 2026, 8:05 p.m.
Created at: March 27, 2026, 3:42 p.m.