Triple

T7471756
Position Surface form Disambiguated ID Type / Status
Subject Oslo Metro Line 4 E176523 entity
Predicate operatedBy P86 FINISHED
Object Sporveien T-banen E132671 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sporveien T-banen | Statement: [Oslo Metro Line 4, operatedBy, Sporveien T-banen]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sporveien T-banen
Context triple: [Oslo Metro Line 4, operatedBy, Sporveien T-banen]
  • A. T-bane
    T-bane is the rapid transit metro system serving Oslo and parts of its surrounding metropolitan area in Norway.
  • B. S-train network
    The S-train network is Copenhagen’s electrified suburban rail system that connects the city center with its surrounding metropolitan areas through frequent, high-capacity commuter services.
  • C. Frederiksværk Line
    The Frederiksværk Line is a Danish regional railway line in North Zealand that connects several towns between Hillerød and Hundested.
  • D. Copenhagen Metro
    Copenhagen Metro is a rapid transit system in Copenhagen, Denmark, known for its driverless trains, frequent service, and extensive underground and elevated lines connecting key parts of the city and suburbs.
  • E. Sporveien chosen
    Sporveien is the municipally owned public transport company in Oslo that operates key parts of the city's metro, tram, and bus infrastructure.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f223fd88190b4c69b95d7cbeeda completed March 27, 2026, 3:15 p.m.
NER Named-entity recognition batch_69c6f415b5cc81909e1e097c90f460b6 completed March 27, 2026, 9:18 p.m.
NED1 Entity disambiguation (via context triple) batch_69c83480a40c8190a7ae3e08022735a1 completed March 28, 2026, 8:05 p.m.
Created at: March 27, 2026, 3:41 p.m.