Triple

T7467371
Position Surface form Disambiguated ID Type / Status
Subject National Institute of Design Jorhat E176406 entity
Predicate instanceOf P0 FINISHED
Object design institute C22410 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: design institute
Context triple: [National Institute of Design Jorhat, instanceOf, design institute]
  • A. design bureau
    A design bureau is an organization or department that specializes in planning, developing, and refining product, graphic, or architectural designs, often providing creative and technical solutions for clients or internal projects.
  • B. design association
    A design association is an organized group or entity that connects design professionals, promotes best practices, and advances the interests and standards of the design field.
  • C. engineering institute
    An engineering institute is an educational and research organization dedicated to teaching, advancing, and applying engineering principles and technologies across various specialized fields.
  • D. design center
    A design center is a dedicated space or facility where customers and professionals can explore, plan, and coordinate design elements such as materials, finishes, and layouts for projects like homes, interiors, or products.
  • E. design practice
    Design practice is the systematic, iterative application of design methods, tools, and principles to solve problems, create meaningful experiences, and refine solutions in real-world contexts.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f223fd88190b4c69b95d7cbeeda completed March 27, 2026, 3:15 p.m.
Created at: March 27, 2026, 3:40 p.m.