Triple
T7461207
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | FRNs |
E176252
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | floating rate note |
C4214
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: floating rate note Context triple: [FRNs, instanceOf, floating rate note]
-
A.
interest rate futures contract
An interest rate futures contract is a standardized, exchange-traded agreement to buy or sell a specified debt instrument or interest rate index at a predetermined price on a future date, used primarily to hedge or speculate on interest rate movements.
-
B.
reference rate
A reference rate is a benchmark interest rate, typically published by a trusted institution, used as a standard for pricing, valuing, or adjusting financial contracts and instruments.
-
C.
interest rate benchmark
An interest rate benchmark is a standardized reference rate, typically derived from the average rates at which major financial institutions lend to one another, used to set or compare interest rates on various financial products and contracts.
-
D.
financial instrument
chosen
A financial instrument is a tradable asset or contract that represents a legal agreement involving monetary value, such as stocks, bonds, derivatives, or loans.
-
E.
interbank offered rate
An interbank offered rate is the interest rate at which major banks are willing to lend unsecured funds to one another in the short-term wholesale money market.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c69f21632481908bf83f6c6da897e3 |
completed | March 27, 2026, 3:15 p.m. |
Created at: March 27, 2026, 3:38 p.m.