Triple

T7458988
Position Surface form Disambiguated ID Type / Status
Subject Alto Hospicio E176195 entity
Predicate transportConnection P1298 FINISHED
Object Route 16
Route 16 is a major roadway in northern Chile that connects the inland city of Alto Hospicio with the coastal port city of Iquique.
E665887 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Route 16 | Statement: [Alto Hospicio, transportConnection, Route 16]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Route 16
Context triple: [Alto Hospicio, transportConnection, Route 16]
  • A. Route 16
    Route 16 is a major east–west state highway in Massachusetts that connects several cities and towns in the Greater Boston area.
  • B. Route 15
    Route 15 is a major highway in New Brunswick, Canada, that serves as a key transportation corridor connecting the city of Moncton to surrounding regions.
  • C. Route 15
    Route 15 is a state highway designation used for a roadway in Massachusetts.
  • D. Route 11
    Route 11 is a SEPTA subway–surface trolley line in Philadelphia that provides light rail service between Center City and the city’s southwestern neighborhoods.
  • E. Route 11
    Route 11 is a major New Brunswick highway that serves as a key transportation corridor connecting Moncton with communities along the province’s eastern and northern coasts.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Route 16
Triple: [Alto Hospicio, transportConnection, Route 16]
Generated description
Route 16 is a major roadway in northern Chile that connects the inland city of Alto Hospicio with the coastal port city of Iquique.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Route 16
Target entity description: Route 16 is a major roadway in northern Chile that connects the inland city of Alto Hospicio with the coastal port city of Iquique.
  • A. Route 16
    Route 16 is a major east–west state highway in Massachusetts that connects several cities and towns in the Greater Boston area.
  • B. Route 15
    Route 15 is a major highway in New Brunswick, Canada, that serves as a key transportation corridor connecting the city of Moncton to surrounding regions.
  • C. Route 15
    Route 15 is a state highway designation used for a roadway in Massachusetts.
  • D. Route 11
    Route 11 is a SEPTA subway–surface trolley line in Philadelphia that provides light rail service between Center City and the city’s southwestern neighborhoods.
  • E. Route 11
    Route 11 is a major New Brunswick highway that serves as a key transportation corridor connecting Moncton with communities along the province’s eastern and northern coasts.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69f21632481908bf83f6c6da897e3 completed March 27, 2026, 3:15 p.m.
NER Named-entity recognition batch_69c6f3d332d08190a05c92a00ed09ac6 completed March 27, 2026, 9:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69c827c73ce081909e31e272c8a752b6 completed March 28, 2026, 7:11 p.m.
NEDg Description generation batch_69c82bd3fe8c819098afb0d51e69383b completed March 28, 2026, 7:28 p.m.
NED2 Entity disambiguation (via description) batch_69c82c2437d08190a1b4cf44cd51df03 completed March 28, 2026, 7:29 p.m.
Created at: March 27, 2026, 3:36 p.m.