Triple
T7452298
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cisco Catalyst switches |
E172036
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Cisco product line |
C2720
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Cisco product line Context triple: [Cisco Catalyst switches, instanceOf, Cisco product line]
-
A.
computer product line
A computer product line is a family of related computer models or configurations that share a common design and components but vary in features, performance, and price to target different customer needs and market segments.
-
B.
product line
chosen
A product line is a group of related products offered by a company that share similar characteristics, target markets, or functions, and are marketed under a common brand strategy.
-
C.
networking hardware company
A networking hardware company designs, manufactures, and sells physical devices and infrastructure that enable data communication and connectivity across computer networks.
-
D.
networking hardware vendor
A networking hardware vendor is a company that designs, manufactures, and sells physical devices such as routers, switches, and firewalls that enable and manage data communication across computer networks.
-
E.
Cisco initiative
A Cisco initiative is a strategic program or project undertaken by Cisco to drive innovation, improve technologies or services, and advance specific business, social, or industry objectives.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a66554c8190add75c65942c0317 |
completed | March 27, 2026, 1:47 p.m. |
Created at: March 27, 2026, 3:14 p.m.