Triple

T7428841
Position Surface form Disambiguated ID Type / Status
Subject South Eastern Railway E171434 entity
Predicate instanceOf P0 FINISHED
Object administrative railway division C13555 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: administrative railway division
Context triple: [South Eastern Railway, instanceOf, administrative railway division]
  • A. railroad operating division chosen
    A railroad operating division is a geographically defined segment of a railway system managed as a unit for train operations, crew assignments, dispatching, and maintenance activities.
  • B. rapid transit division
    A rapid transit division is an organizational unit within a transportation agency responsible for planning, operating, and maintaining high-frequency, high-capacity urban rail or bus rapid transit services.
  • C. railway works section
    A railway works section is a defined segment of railway infrastructure and track, managed as a unit for construction, maintenance, and operational oversight.
  • D. historical transit operating division
    A historical transit operating division is an organizational unit within a past or legacy public transportation system responsible for managing and coordinating transit services, personnel, and resources within a specific geographic area or operational domain.
  • E. railway infrastructure manager
    A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a63491881909281f73d4d5643bf completed March 27, 2026, 1:47 p.m.
Created at: March 27, 2026, 3:12 p.m.