Triple

T7422509
Position Surface form Disambiguated ID Type / Status
Subject Minnesota Twins Ballpark (planning name) E171283 entity
Predicate instanceOf P0 FINISHED
Object planned facility C19689 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned facility
Context triple: [Minnesota Twins Ballpark (planning name), instanceOf, planned facility]
  • A. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • B. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • C. production facility
    A production facility is a physical site equipped with machinery, resources, and personnel dedicated to manufacturing goods or processing materials at scale.
  • D. facility chosen
    A facility is a physical place or infrastructure designed and equipped to support specific activities, services, or operations.
  • E. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a625d048190af70eb8b63bec5a0 completed March 27, 2026, 1:47 p.m.
Created at: March 27, 2026, 3:11 p.m.