Triple
T7419814
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Aller Bridge in Celle |
E171216
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river bridge |
C22181
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river bridge Context triple: [Aller Bridge in Celle, instanceOf, river bridge]
-
A.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
B.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
C.
railway bridge
A railway bridge is a structure built to carry train tracks over obstacles such as roads, rivers, valleys, or other railways, ensuring safe and continuous rail transport.
-
D.
railroad bridge
A railroad bridge is a specialized structure that carries railway tracks over obstacles such as roads, rivers, valleys, or other rail lines, ensuring safe and continuous train passage.
-
E.
iron bridge
An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a625d048190af70eb8b63bec5a0 |
completed | March 27, 2026, 1:47 p.m. |
Created at: March 27, 2026, 3:11 p.m.