Triple

T7396635
Position Surface form Disambiguated ID Type / Status
Subject Microchip Technology E170636 entity
Predicate acquisitionOfAtmelCompleted P15703 FINISHED
Object 2016 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2016 | Statement: [Microchip Technology, acquisitionOfAtmelCompleted, 2016]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: acquisitionOfAtmelCompleted
Context triple: [Microchip Technology, acquisitionOfAtmelCompleted, 2016]
  • A. acquisitionResultedIn
    Indicates that an acquisition event led to a particular outcome, state, or consequence for the involved entities.
  • B. acquisitionStatus
    Indicates the current state or outcome of an acquisition process between entities (e.g., pending, completed, failed, or canceled).
  • C. hardwareFinish
    Indicates the type or style of surface treatment or coating applied to a piece of hardware.
  • D. acquisitionCompletedYear chosen
    Indicates the calendar year in which an acquisition transaction was fully completed.
  • E. acquisitionPhase
    Indicates the stage or phase within an overall acquisition process in which the related entities are currently involved.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a5f04188190ac266569c9280347 completed March 27, 2026, 1:47 p.m.
NER Named-entity recognition batch_69c6f248f79c819094b1d1e2c3d511d1 completed March 27, 2026, 9:10 p.m.
PD Predicate disambiguation batch_69c6f0309cc88190b55d278969400294 completed March 27, 2026, 9:01 p.m.
Created at: March 27, 2026, 3:09 p.m.