Triple

T7394527
Position Surface form Disambiguated ID Type / Status
Subject Howden Reservoir E170587 entity
Predicate connectedTo P37 FINISHED
Object Ladybower Dam E114602 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ladybower Dam | Statement: [Howden Reservoir, connectedTo, Ladybower Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ladybower Dam
Context triple: [Howden Reservoir, connectedTo, Ladybower Dam]
  • A. Derwent Dam
    Derwent Dam is a large historic masonry dam in Derbyshire, England, best known for its role in World War II RAF "Dambusters" training and as a prominent feature of the Upper Derwent Valley.
  • B. Lymm Dam
    Lymm Dam is a historic man-made lake and surrounding woodland in Lymm, Cheshire, popular for walking, wildlife, and scenic views.
  • C. Ladybower Reservoir chosen
    Ladybower Reservoir is a large Y-shaped drinking-water reservoir in the Upper Derwent Valley of Derbyshire, England, known for its distinctive plughole spillways and surrounding Peak District scenery.
  • D. Aviemore Dam
    Aviemore Dam is a major hydroelectric dam in New Zealand’s South Island, forming Lake Aviemore as part of the Waitaki River power scheme.
  • E. Keswick Dam
    Keswick Dam is a concrete gravity dam on the Sacramento River in Northern California that regulates flows and generates hydroelectric power as part of the region’s large federal water management system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a5f04188190ac266569c9280347 completed March 27, 2026, 1:47 p.m.
NER Named-entity recognition batch_69c6f2263b48819089319a2a2f0d3357 completed March 27, 2026, 9:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8343c1b308190b4ba681158b54aba completed March 28, 2026, 8:04 p.m.
Created at: March 27, 2026, 3:09 p.m.