Triple

T7379951
Position Surface form Disambiguated ID Type / Status
Subject Sault Ste. Marie Canal Stores Building E170220 entity
Predicate instanceOf P0 FINISHED
Object canal support building C16044 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: canal support building
Context triple: [Sault Ste. Marie Canal Stores Building, instanceOf, canal support building]
  • A. canal builder
    A canal builder is a person or entity responsible for planning, designing, and constructing artificial waterways to facilitate transportation, irrigation, drainage, or water management.
  • B. canal
    A canal is a man-made waterway constructed to facilitate transportation, irrigation, drainage, or water management between different locations.
  • C. canal bridge
    A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
  • D. canal authority
    A canal authority is an organization responsible for managing, operating, and regulating a canal and its associated waterways, infrastructure, and traffic.
  • E. canal infrastructure chosen
    Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a5d0ed08190b6d361e68f813330 completed March 27, 2026, 1:47 p.m.
Created at: March 27, 2026, 3:08 p.m.