Triple
T7366056
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | St. Clair Avenue corridor |
E169871
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | streetcar corridor |
C22083
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: streetcar corridor Context triple: [St. Clair Avenue corridor, instanceOf, streetcar corridor]
-
A.
streetcar route
A streetcar route is a predefined path along public streets that streetcars follow to provide scheduled passenger transportation between specific stops or terminals.
-
B.
streetcar stop
A streetcar stop is a designated location along a streetcar line where passengers can safely board and alight from streetcars, often marked with signage, shelters, or platforms.
-
C.
streetcar magnate
A streetcar magnate is a powerful business leader who owns, controls, or dominates streetcar and urban transit companies, often shaping a city's transportation infrastructure and related real estate development.
-
D.
streetcar system
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
-
E.
streetcar model
A streetcar model is a scaled representation of a tram or streetcar vehicle, typically used for display, education, or hobbyist model railroading.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a5ade988190885b7175f63b7534 |
completed | March 27, 2026, 1:47 p.m. |
Created at: March 27, 2026, 3:06 p.m.