Triple
T7363892
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ebisu Garden Place |
E169818
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban redevelopment complex |
C14404
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban redevelopment complex Context triple: [Ebisu Garden Place, instanceOf, urban redevelopment complex]
-
A.
urban regeneration area
An urban regeneration area is a designated part of a city targeted for coordinated physical, economic, social, and environmental improvements to reverse decline and promote sustainable development.
-
B.
urban development
Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
-
C.
urban plaza
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
-
D.
urban ensemble
chosen
An urban ensemble is a cohesive grouping of buildings, public spaces, and infrastructure whose combined form, function, and character create a distinct, perceivable urban identity.
-
E.
civic building complex
A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a5ade988190885b7175f63b7534 |
completed | March 27, 2026, 1:47 p.m. |
Created at: March 27, 2026, 3:06 p.m.