Triple
T7363255
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Loop 202 |
E169803
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object | Interstate 17 |
E319202
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 17 | Statement: [Loop 202, connectsTo, Interstate 17]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Interstate 17 Context triple: [Loop 202, connectsTo, Interstate 17]
-
A.
Interstate 17
chosen
Interstate 17 is a primary north–south freeway in Arizona that connects Phoenix with Flagstaff and serves as a key route to northern Arizona destinations.
-
B.
Interstate 19
Interstate 19 is a short U.S. Interstate Highway in southern Arizona that uniquely uses metric distance signs and connects Tucson to the U.S.–Mexico border at Nogales.
-
C.
Interstate 25
Interstate 25 is a major north–south U.S. highway running through the Rocky Mountain region, connecting cities from New Mexico through Colorado to Wyoming.
-
D.
Highway 70
Highway 70 is a major north–south roadway in northern Israel that connects several key cities and junctions in the region.
-
E.
Interstate 172
Interstate 172 is a short auxiliary Interstate Highway in western Illinois that connects Quincy to Interstate 72, serving as a spur route to the main corridor.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a5ade988190885b7175f63b7534 |
completed | March 27, 2026, 1:47 p.m. |
| NER | Named-entity recognition | batch_69c6f1603e1481909fb1dce2c9a7c577 |
completed | March 27, 2026, 9:06 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cbde8e8264819082a3954072dffd09 |
completed | March 31, 2026, 2:47 p.m. |
Created at: March 27, 2026, 3:06 p.m.