Triple
T7355457
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Erin Mills |
E169612
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Planned community |
C5974
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Planned community Context triple: [Erin Mills, instanceOf, Planned community]
-
A.
planned residential community
chosen
A planned residential community is a deliberately designed neighborhood or development where housing, infrastructure, amenities, and land use are pre-organized to create a cohesive living environment.
-
B.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
C.
town plan
A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
-
D.
community plan area
A community plan area is a geographically defined section of a jurisdiction for which detailed land use, development, and infrastructure policies are established to guide local growth and community character.
-
E.
village complex
A village complex is a clustered arrangement of residential, communal, and support structures that together form the functional and social core of a small rural settlement.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a59f2288190877ca15c19b1e822 |
completed | March 27, 2026, 1:47 p.m. |
Created at: March 27, 2026, 3:05 p.m.