Triple
T7343459
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gilimanuk–Ketapang ferry route |
E169315
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Trans-Java–Bali transport corridor
The Trans-Java–Bali transport corridor is a major inter-island transportation axis in Indonesia that links the road networks of Java and Bali, facilitating the movement of people and goods across the two islands.
|
E658465
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Trans-Java–Bali transport corridor | Statement: [Gilimanuk–Ketapang ferry route, partOf, Trans-Java–Bali transport corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Trans-Java–Bali transport corridor Context triple: [Gilimanuk–Ketapang ferry route, partOf, Trans-Java–Bali transport corridor]
-
A.
Trans-Sulawesi Highway
The Trans-Sulawesi Highway is a major road network spanning the Indonesian island of Sulawesi, linking key cities and regions to support transportation, trade, and regional development.
-
B.
Trans-Sumatran Highway
The Trans-Sumatran Highway is a major road corridor that spans the length of Sumatra, connecting key cities and regions across the Indonesian island to support transportation and economic activity.
-
C.
Jakarta Outer Ring Road
Jakarta Outer Ring Road is a major toll expressway encircling Jakarta, Indonesia, designed to alleviate inner-city traffic congestion and connect key urban and suburban areas.
-
D.
Solo–Ngawi toll road corridor
The Solo–Ngawi toll road corridor is a major expressway in Central and East Java, Indonesia, that enhances regional connectivity by linking the city of Surakarta (Solo) with Ngawi and integrating into the broader Trans-Java toll network.
-
E.
Jakarta–Merak corridor
The Jakarta–Merak corridor is a major transportation axis in western Java, Indonesia, linking the capital region around Jakarta with the key ferry port of Merak that connects Java to Sumatra.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Trans-Java–Bali transport corridor Triple: [Gilimanuk–Ketapang ferry route, partOf, Trans-Java–Bali transport corridor]
Generated description
The Trans-Java–Bali transport corridor is a major inter-island transportation axis in Indonesia that links the road networks of Java and Bali, facilitating the movement of people and goods across the two islands.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Trans-Java–Bali transport corridor Target entity description: The Trans-Java–Bali transport corridor is a major inter-island transportation axis in Indonesia that links the road networks of Java and Bali, facilitating the movement of people and goods across the two islands.
-
A.
Trans-Sulawesi Highway
The Trans-Sulawesi Highway is a major road network spanning the Indonesian island of Sulawesi, linking key cities and regions to support transportation, trade, and regional development.
-
B.
Trans-Sumatran Highway
The Trans-Sumatran Highway is a major road corridor that spans the length of Sumatra, connecting key cities and regions across the Indonesian island to support transportation and economic activity.
-
C.
Jakarta Outer Ring Road
Jakarta Outer Ring Road is a major toll expressway encircling Jakarta, Indonesia, designed to alleviate inner-city traffic congestion and connect key urban and suburban areas.
-
D.
Solo–Ngawi toll road corridor
The Solo–Ngawi toll road corridor is a major expressway in Central and East Java, Indonesia, that enhances regional connectivity by linking the city of Surakarta (Solo) with Ngawi and integrating into the broader Trans-Java toll network.
-
E.
Jakarta–Merak corridor
The Jakarta–Merak corridor is a major transportation axis in western Java, Indonesia, linking the capital region around Jakarta with the key ferry port of Merak that connects Java to Sumatra.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a57710481909f0c1f3c6ebdb6f2 |
completed | March 27, 2026, 1:47 p.m. |
| NER | Named-entity recognition | batch_69c6f0ed78908190a169f094cb3f62f0 |
completed | March 27, 2026, 9:04 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c7fa8a2a908190886e11a7d8df6c5e |
completed | March 28, 2026, 3:58 p.m. |
| NEDg | Description generation | batch_69c7fd2512fc819086bf3b44a42375d8 |
completed | March 28, 2026, 4:09 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69c7fd8a691481909af618b2c2455cc8 |
completed | March 28, 2026, 4:10 p.m. |
Created at: March 27, 2026, 3:04 p.m.