Triple

T7333949
Position Surface form Disambiguated ID Type / Status
Subject Baruch Plan for international control of atomic energy E169076 entity
Predicate differsFrom P278 FINISHED
Object Acheson–Lilienthal Report by insisting on strong enforcement measures
The Acheson–Lilienthal Report was a 1946 U.S. policy proposal that advocated international ownership and management of nuclear energy to prevent atomic warfare, emphasizing cooperative control over punitive enforcement.
E169076 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Acheson–Lilienthal Report by insisting on strong enforcement measures | Statement: [Baruch Plan for international control of atomic energy, differsFrom, Acheson–Lilienthal Report by insisting on strong enforcement measures]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Acheson–Lilienthal Report by insisting on strong enforcement measures
Context triple: [Baruch Plan for international control of atomic energy, differsFrom, Acheson–Lilienthal Report by insisting on strong enforcement measures]
  • A. Wedemeyer Report
    The Wedemeyer Report is a post–World War II strategic assessment authored by U.S. Army General Albert C. Wedemeyer that evaluated American military and political policy in Asia, particularly regarding China and Korea.
  • B. Lytton Commission report
    The Lytton Commission report was a 1932 League of Nations investigation that condemned Japan’s actions in Manchuria and refused to recognize the puppet state of Manchukuo.
  • C. Baruch Plan for international control of atomic energy
    The Baruch Plan for international control of atomic energy was a 1946 U.S. proposal to place all nuclear activities under international oversight to prevent nuclear weapons proliferation and promote peaceful uses of atomic energy.
  • D. Patten Report
    The Patten Report is a landmark 1999 document that recommended sweeping reforms to policing in Northern Ireland, leading to the creation of the Police Service of Northern Ireland (PSNI) and reshaping the role and structure of the former Royal Ulster Constabulary.
  • E. Franck Report
    The Franck Report was a 1945 memorandum by scientists of the Manhattan Project’s Metallurgical Laboratory urging caution and international control over nuclear weapons, and recommending a non-combat demonstration of the atomic bomb.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Acheson–Lilienthal Report by insisting on strong enforcement measures
Triple: [Baruch Plan for international control of atomic energy, differsFrom, Acheson–Lilienthal Report by insisting on strong enforcement measures]
Generated description
The Acheson–Lilienthal Report was a 1946 U.S. policy proposal that advocated international ownership and management of nuclear energy to prevent atomic warfare, emphasizing cooperative control over punitive enforcement.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Acheson–Lilienthal Report by insisting on strong enforcement measures
Target entity description: The Acheson–Lilienthal Report was a 1946 U.S. policy proposal that advocated international ownership and management of nuclear energy to prevent atomic warfare, emphasizing cooperative control over punitive enforcement.
  • A. Wedemeyer Report
    The Wedemeyer Report is a post–World War II strategic assessment authored by U.S. Army General Albert C. Wedemeyer that evaluated American military and political policy in Asia, particularly regarding China and Korea.
  • B. Lytton Commission report
    The Lytton Commission report was a 1932 League of Nations investigation that condemned Japan’s actions in Manchuria and refused to recognize the puppet state of Manchukuo.
  • C. Baruch Plan for international control of atomic energy chosen
    The Baruch Plan for international control of atomic energy was a 1946 U.S. proposal to place all nuclear activities under international oversight to prevent nuclear weapons proliferation and promote peaceful uses of atomic energy.
  • D. Patten Report
    The Patten Report is a landmark 1999 document that recommended sweeping reforms to policing in Northern Ireland, leading to the creation of the Police Service of Northern Ireland (PSNI) and reshaping the role and structure of the former Royal Ulster Constabulary.
  • E. Franck Report
    The Franck Report was a 1945 memorandum by scientists of the Manhattan Project’s Metallurgical Laboratory urging caution and international control over nuclear weapons, and recommending a non-combat demonstration of the atomic bomb.
  • F. None of above.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a568a6481908f11e20db7bc8446 completed March 27, 2026, 1:47 p.m.
NER Named-entity recognition batch_69c6f0c25758819095aa5041c6ecff07 completed March 27, 2026, 9:04 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7ef1eb370819081a4c6e75ceaf2eb completed March 28, 2026, 3:09 p.m.
NEDg Description generation batch_69c7f2e1517c8190bb08530c299ab34a completed March 28, 2026, 3:25 p.m.
NED2 Entity disambiguation (via description) batch_69c7f3ae2a18819093ef606b32266fde completed March 28, 2026, 3:28 p.m.
Created at: March 27, 2026, 3:04 p.m.