Triple

T7333446
Position Surface form Disambiguated ID Type / Status
Subject Big Chute Marine Railway E169063 entity
Predicate instanceOf P0 FINISHED
Object marine railway C16149 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: marine railway
Context triple: [Big Chute Marine Railway, instanceOf, marine railway]
  • A. ocean liner
    An ocean liner is a large, robust passenger ship designed for regular long-distance sea voyages, typically across oceans, with an emphasis on speed, safety, and comfort rather than leisure amenities alone.
  • B. merchant navy
    The merchant navy is a fleet of commercial ships and their crews responsible for transporting cargo and passengers across international waters in support of global trade and logistics.
  • C. maritime passage
    A maritime passage is a navigable sea route or waterway that connects larger bodies of water, enabling the movement of ships and maritime traffic between regions.
  • D. maritime structure chosen
    A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
  • E. naval auxiliary ship
    A naval auxiliary ship is a non-combat vessel that supports naval operations by providing services such as supply, repair, transport, and logistical assistance to combat ships and shore facilities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a568a6481908f11e20db7bc8446 completed March 27, 2026, 1:47 p.m.
Created at: March 27, 2026, 3:04 p.m.