Triple

T7328806
Position Surface form Disambiguated ID Type / Status
Subject Mentor Graphics E168945 entity
Predicate instanceOf P0 FINISHED
Object electronic design automation company C21982 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electronic design automation company
Context triple: [Mentor Graphics, instanceOf, electronic design automation company]
  • A. Fabless semiconductor company
    A fabless semiconductor company is a business that designs and sells integrated circuits and other semiconductor devices while outsourcing the actual manufacturing to specialized fabrication plants (foundries).
  • B. automotive software company
    A company that designs, develops, and maintains software solutions specifically for vehicles and the automotive industry, such as embedded systems, driver assistance, connectivity, and fleet management platforms.
  • C. integrated circuit technology
    Integrated circuit technology is the design and fabrication of miniaturized electronic circuits on semiconductor chips, enabling complex, high-speed, and low-power electronic systems.
  • D. semiconductor engineer
    A semiconductor engineer designs, develops, and optimizes microelectronic devices and integrated circuits by applying principles of materials science, electrical engineering, and manufacturing processes.
  • E. semiconductor manufacturing facility
    A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a54cacc81908e3b773441f19566 completed March 27, 2026, 1:47 p.m.
Created at: March 27, 2026, 3:03 p.m.