Triple
T7328806
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mentor Graphics |
E168945
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electronic design automation company |
C21982
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electronic design automation company Context triple: [Mentor Graphics, instanceOf, electronic design automation company]
-
A.
Fabless semiconductor company
A fabless semiconductor company is a business that designs and sells integrated circuits and other semiconductor devices while outsourcing the actual manufacturing to specialized fabrication plants (foundries).
-
B.
automotive software company
A company that designs, develops, and maintains software solutions specifically for vehicles and the automotive industry, such as embedded systems, driver assistance, connectivity, and fleet management platforms.
-
C.
integrated circuit technology
Integrated circuit technology is the design and fabrication of miniaturized electronic circuits on semiconductor chips, enabling complex, high-speed, and low-power electronic systems.
-
D.
semiconductor engineer
A semiconductor engineer designs, develops, and optimizes microelectronic devices and integrated circuits by applying principles of materials science, electrical engineering, and manufacturing processes.
-
E.
semiconductor manufacturing facility
A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68a54cacc81908e3b773441f19566 |
completed | March 27, 2026, 1:47 p.m. |
Created at: March 27, 2026, 3:03 p.m.