Triple

T7322178
Position Surface form Disambiguated ID Type / Status
Subject Adolphe Appia E168777 entity
Predicate instanceOf P0 FINISHED
Object scenographer C6277 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: scenographer
Context triple: [Adolphe Appia, instanceOf, scenographer]
  • A. costume designer
    A costume designer is a creative professional who conceptualizes, designs, and oversees the creation of clothing and accessories that define characters’ appearance in film, theater, television, or other performances.
  • B. production designer
    A production designer is the creative professional responsible for the overall visual concept of a film, television show, or theater production, overseeing sets, locations, props, and often collaborating closely with directors and cinematographers to establish the project’s look and feel.
  • C. theatre practitioner chosen
    A theatre practitioner is an individual who actively creates, performs, directs, designs, or otherwise contributes artistically and technically to the production and study of live theatrical performance.
  • D. theatre director
    A theatre director is the creative leader who interprets a script and coordinates actors, designers, and technical staff to shape the overall vision and execution of a stage production.
  • E. stage magician
    A stage magician is a performer who entertains an audience by creating the illusion of impossible feats through sleight of hand, misdirection, and theatrical presentation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68a54cacc81908e3b773441f19566 completed March 27, 2026, 1:47 p.m.
Created at: March 27, 2026, 3:03 p.m.