Triple

T7295278
Position Surface form Disambiguated ID Type / Status
Subject Mount Beacon E164504 entity
Predicate inclineRailwayStatus P41715 FINISHED
Object no longer in operation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: no longer in operation | Statement: [Mount Beacon, inclineRailwayStatus, no longer in operation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: inclineRailwayStatus
Context triple: [Mount Beacon, inclineRailwayStatus, no longer in operation]
  • A. railStatus chosen
    Indicates the current operational condition or state of a rail-related entity (such as a track, line, or service) within the system.
  • B. isOnRailway
    Indicates that one entity is positioned on, aligned with, or traveling along a railway track or railway system in relation to another entity.
  • C. railroadGrade
    Indicates that one entity is at the elevation or level of a railroad track or crossing relative to another entity.
  • D. railwayLineNow
    Indicates that a previously existing railway line has been replaced, succeeded, or is currently represented by a new or different railway line.
  • E. railLineStatusAfterward
    Indicates the condition or operational status of a rail line after a specified event or time period has occurred.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6887a499881909dd23341399c59d8 completed March 27, 2026, 1:39 p.m.
NER Named-entity recognition batch_69c6eb8d0c6c8190b32cd08b9a5d96cc completed March 27, 2026, 8:41 p.m.
PD Predicate disambiguation batch_69c6e76c5fbc8190b378830082f11cb0 completed March 27, 2026, 8:24 p.m.
Created at: March 27, 2026, 3 p.m.