Triple

T7293246
Position Surface form Disambiguated ID Type / Status
Subject MTA Bridges and Tunnels network E164450 entity
Predicate instanceOf P0 FINISHED
Object transportation infrastructure system C3584 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6887a499881909dd23341399c59d8 completed March 27, 2026, 1:39 p.m.
Created at: March 27, 2026, 3 p.m.