Triple
T7279219
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Intel Demand Based Switching |
E163105
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | CPU power saving feature |
C22273
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: CPU power saving feature Context triple: [Intel Demand Based Switching, instanceOf, CPU power saving feature]
-
A.
CMOS microprocessor
A CMOS microprocessor is a central processing unit implemented using complementary metal-oxide-semiconductor technology, providing high integration, low power consumption, and reliable digital computation on a single chip.
-
B.
battery
A battery is an energy storage device that converts chemical energy into electrical energy to provide power to electronic systems and components.
-
C.
microprocessor
A microprocessor is a compact, integrated circuit that performs the arithmetic, logic, control, and input/output operations of a computer’s central processing unit (CPU) on a single chip.
-
D.
proprietary governor
A proprietary governor is a colonial-era official or authority figure granted governing powers over a territory by a private owner or chartered company rather than directly by a sovereign state.
-
E.
energy management device
An energy management device is a system component that monitors, controls, and optimizes the consumption, storage, and distribution of energy within a defined environment or network.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6885c5964819085b209701769877f |
completed | March 27, 2026, 1:38 p.m. |
Created at: March 27, 2026, 2:59 p.m.