Triple

T7268066
Position Surface form Disambiguated ID Type / Status
Subject Sanaga River E161028 entity
Predicate hasHydroelectricDam P15311 FINISHED
Object Edea Dam
Edea Dam is a major hydroelectric power facility in Cameroon that harnesses the flow of the Sanaga River to generate electricity.
E652900 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Edea Dam | Statement: [Sanaga River, hasHydroelectricDam, Edea Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Edea Dam
Context triple: [Sanaga River, hasHydroelectricDam, Edea Dam]
  • A. Peligre Dam
    Peligre Dam is a major hydroelectric and irrigation dam in central Haiti that forms Lake Péligre and plays a key role in the country’s power supply and water management.
  • B. Itá Dam
    Itá Dam is a large hydroelectric power plant and reservoir on the Uruguay River in southern Brazil, known for its significant contribution to regional electricity generation.
  • C. Solina Dam
    Solina Dam is a major hydroelectric and flood-control dam in southeastern Poland, known for creating the large artificial Solina Lake in the Bieszczady region.
  • D. Jurala Dam
    Jurala Dam is a major irrigation and hydroelectric project built across the Krishna River in Telangana, India.
  • E. Roza Dam
    Roza Dam is a diversion dam on Washington State’s Yakima River that helps supply irrigation water as part of the U.S. Bureau of Reclamation’s Yakima Project.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Edea Dam
Triple: [Sanaga River, hasHydroelectricDam, Edea Dam]
Generated description
Edea Dam is a major hydroelectric power facility in Cameroon that harnesses the flow of the Sanaga River to generate electricity.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Edea Dam
Target entity description: Edea Dam is a major hydroelectric power facility in Cameroon that harnesses the flow of the Sanaga River to generate electricity.
  • A. Peligre Dam
    Peligre Dam is a major hydroelectric and irrigation dam in central Haiti that forms Lake Péligre and plays a key role in the country’s power supply and water management.
  • B. Itá Dam
    Itá Dam is a large hydroelectric power plant and reservoir on the Uruguay River in southern Brazil, known for its significant contribution to regional electricity generation.
  • C. Solina Dam
    Solina Dam is a major hydroelectric and flood-control dam in southeastern Poland, known for creating the large artificial Solina Lake in the Bieszczady region.
  • D. Jurala Dam
    Jurala Dam is a major irrigation and hydroelectric project built across the Krishna River in Telangana, India.
  • E. Roza Dam
    Roza Dam is a diversion dam on Washington State’s Yakima River that helps supply irrigation water as part of the U.S. Bureau of Reclamation’s Yakima Project.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885181008190b419040e22939c7c completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6eae8cc288190bc3ae3c7b38980d0 completed March 27, 2026, 8:39 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7db1e4f9c8190a23ce5a35073b7c7 completed March 28, 2026, 1:43 p.m.
NEDg Description generation batch_69c7dbd350a08190aa34ada9ba8d39ce completed March 28, 2026, 1:46 p.m.
NED2 Entity disambiguation (via description) batch_69c7dc7cb2d48190a40523eb7b03a9ef completed March 28, 2026, 1:49 p.m.
Created at: March 27, 2026, 2:58 p.m.