Triple

T7257980
Position Surface form Disambiguated ID Type / Status
Subject Jatiluhur Reservoir E157770 entity
Predicate alsoKnownAs P39 FINISHED
Object Waduk Jatiluhur E157770 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Waduk Jatiluhur | Statement: [Jatiluhur Reservoir, alsoKnownAs, Waduk Jatiluhur]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Waduk Jatiluhur
Context triple: [Jatiluhur Reservoir, alsoKnownAs, Waduk Jatiluhur]
  • A. Jatiluhur Reservoir chosen
    Jatiluhur Reservoir is a large multipurpose dam and artificial lake in West Java, Indonesia, used for hydroelectric power, irrigation, flood control, and water supply.
  • B. Selorejo Dam
    Selorejo Dam is a multipurpose reservoir in East Java, Indonesia, known for irrigation, hydropower generation, flood control, and tourism within the Brantas River basin.
  • C. Jatigede Dam
    Jatigede Dam is a large multipurpose reservoir and hydroelectric dam in West Java, Indonesia, built primarily for flood control, irrigation, power generation, and water supply.
  • D. Waduk Saguling
    Waduk Saguling is a major artificial lake and hydroelectric reservoir located on the Citarum River in West Java, Indonesia.
  • E. Cirata Reservoir
    Cirata Reservoir is a large artificial lake and hydroelectric power reservoir in West Java, Indonesia, used for electricity generation, irrigation, and fisheries.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6882d81d4819085f7ff862951ee4f completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6eaa3d88081908f59ca5a85790290 completed March 27, 2026, 8:37 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7db14f6c481908084aaa49d82787d completed March 28, 2026, 1:43 p.m.
Created at: March 27, 2026, 2:57 p.m.