Triple

T7255810
Position Surface form Disambiguated ID Type / Status
Subject Schwerer Gustav E157718 entity
Predicate deploymentRequirement P34266 FINISHED
Object large construction crew LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: large construction crew | Statement: [Schwerer Gustav, deploymentRequirement, large construction crew]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: deploymentRequirement
Context triple: [Schwerer Gustav, deploymentRequirement, large construction crew]
  • A. deploymentRequires chosen
    Indicates that performing a particular deployment is contingent upon the prior existence, completion, or availability of another specified resource, condition, or action.
  • B. distributionRequirement
    Indicates that one entity specifies or imposes conditions, rules, or criteria governing how another entity must be distributed or allocated.
  • C. deploymentCapability
    Indicates the ability or capacity of an entity to deploy, release, or roll out another entity (such as a system, service, or resource) into an operational environment.
  • D. deploymentOption
    Indicates the available or chosen way in which something (such as a system, service, or component) can be deployed or made operational.
  • E. maintenanceRequirement
    Indicates that an entity is obligated to perform, schedule, or adhere to specific maintenance activities or conditions for another entity or system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6882d81d4819085f7ff862951ee4f completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6eaa0c76c81909fe43ed6938a13ea completed March 27, 2026, 8:37 p.m.
PD Predicate disambiguation batch_69c6e7666ffc81908bf643d8257e6337 completed March 27, 2026, 8:24 p.m.
Created at: March 27, 2026, 2:56 p.m.